Sunday, 19 October 2008

Costing in Drawing-in



Costing in Drawing-in

Drawers and reachers are paid their basic wages on piece rate system. The rates are related to the type of cloth to be woven. the basis of allocation of expenses to the different types of cloths are

1. Basic Wages of drawers and Reachers= Rate per 1000 ends x total production in 1000 ends.
2. DA to drawers and reachers and all other expenses = total production/production per shift

Cost of Drawing-in

Unit costs of this process as cost per 1000 ends. The cost of this process is calculated as shown below:

Cost of drawing-in per piece lengtrh = (cost per 1000 ends x total no of ends x tape length)/ weaver's beam length



Related Posts Plugin for WordPress, Blogger...

Total Pageviews