Thursday, 2 October 2008

Process Control in Warping-3



Process Control in Warping-3

Maintenance Check points at Warping

Machine

1. Clean with compressed air at every creel change-per shift
2. Clean with compressed air and cleaning waste- weekly

Package Alignment at the Creel

1. Look for incorrectly aligned packages, correct if the non-alignment is too severe- regularly
2. completely guage the creel with the help of a gauge- half yearly

Tension Weights

In case of high speed warping machine, check tension weights at every count change- regularly

Tension Level

Check the tension levels with tension meter- Monthly

Stop Motion and Brake

1. Ensure that the machine stops within 1 1/2 revolutions fo the drum in case of high speed warping- regularly
2. Check with condition of drop pins and replace those with cut marks- regularly.

Guide rollers

1. Check for concentricity- half yearly

Beams
1. Check for the conditions of flanges and beam shafts, repair damaged beams- regularly

Creel Fans
1. Check that creel fans oscillate properly and are not chocked with fluff- regularly.

Parts in yarn path

1. Check for cuts in parts of machine in yarns parts regularly.
2. repair/replace the parts with cut marks- weekly

How to cite this article:
Goyal, P. Process Control in Warping-3. My Textile Notes. Available at: https://mytextilenotes.blogspot.com/2008/10/process-control-in-warping-3.html?m=0
Have a textile question?

If you have a question related to this topic, you are welcome to ask it in the My Textile Notes Discussion Forum.

Students, merchandisers, designers, researchers and textile professionals are welcome to participate.

Total Pageviews